LFG Construction obtained the mandate to execute the construction of the Mont-Rothery wind farm, located at 4 km North-East from the city of Murdochville in Gaspesie.
A turnkey project included the erection of 37 Senvion wind turbines with a capacity of 74 megawatts, the construction of 41,9 km of roads, construction of a collector system of 38,3 km and the construction of a substation. Everything was done within the planned schedule.
This mandate was a challenge on the project management because of the tight schedule.